Innovative ‘active alignment’ was employed during construction to correct the slight lean that a building with all its weight to one side of its footprint developed, tightening joints incrementally to bring it back into true. The north core, structurally separate from the megaframes but firmly connected, houses the lifts, toilets, risers and local plant, this last also contributing to freer office floors. Rogers Stirk Harbour + Partners have of course a rich presence in the Square Mile, one that goes far beyond the landmark Lloyd’s of London, completed more than 25 years ago and standing directly opposite the Leadenhall Building. The northern support core of the Leadenhall Building (Richard Bryant, 2014 Courtesy of British Land/Oxford Properties)

Combining flexible office space with retail and dining facilities, the development features a spectacularly landscaped, seven-storey open space at the base of the building, which covers nearly half an acre and is of a scale unprecedented in London. The diagonal structural bracing will be visible through the building’s façade from the interior and exterior. Work has restarted on the Leadenhall Building in London by architects Rogers Stirk Harbour + Partners.

The transaction involved developer British Land and its partner Oxford Properties, who sold the tower to CC Land, a Hong Kong based company. For over 30 years, the architects were based in a riverside building at Thames Wharf, west London, with the River Cafe restaurant founded by Richard Rogers’ wife Ruth acting as a de facto staff canteen. In collaboration with construction managers Laing O’Rourke, the construction processes were streamlined and the this article from Dezeen superstructure divided into large components to be prefabricated off-site and brought to site to a strict timetable.

The office tower, located opposite Lloyd’s in the City of London, is the tallest office space in the immediate area. The project, which is expected to be completed by 2012, will reappoint and add new technologies to the hotel’s 659 guestrooms and suites, redesign the Gran While contracts have been exchanged between the parties involved, the sale awaits approval by CC Land’s shareholders.

No wet trade work was involved above the foundations, all 52 floors erected using only steel and pre-cast reinforced concrete plates. “The technology makes a number of means of expression possible,” begins Stirk. The latter has no ‘branding’ during its life, and must appeal to many possible occupiers over that timespan. Every floor in the building is of constant width but, as the building rises, diminishing depth (by 750mm each time).

The ability to build high within the development allows for the provision of a significant public space at the building’s base – maintaining existing pedestrian connections and creating an important new meeting space in the City – without compromising on lettable area. At all times, Cordless maintained independence, objectivity, commitment and professionalism – and it was this combination that delivered the firepower that our relocation project needed to succeed.” “Our ultimate goal was to have all technology working on day 1 and with the help of Cordless, we did. High performance audio speakers and projection technology blend expertly into the ceiling, looking more a part of the office design than functional technology. Video conferencing is provided in all meeting rooms, using the latest powerful, smart and compact conference technology, freeing up valuable space for creative working.

The position of the northern support core relative to the office areas means that the structure is not required to be over-clad with fire protection, allowing the whole to be designed and expressed as visible steelwork. The northern support core is conceived as a detached tower containing all passenger and goods lifts, service risers, on-floor plant and WCs. The office floors take the form of simple rectangular floor plates which progressively diminish in depth by 750 millimetres towards the apex. The ladder frame contributes to the vertical emphasis of the building, and encloses the fire-fighting cores that serve the office floors.

Throughout his career, he received numerous distinctions, including the Pritzker Prize in 2007, widely regarded as architecture’s highest honor, the RIBA Gold Medal in 1985, and the Golden Lion for Lifetime Achievement at the Venice Biennale in 2006. Likewise, the Lloyd’s building in London stands as another paradigmatic example of his approach, where technology and programmatic flexibility are integrated into a proposal that challenges traditional typologies. He was educated at the Architectural Association in London, a key institution in the renewal of architectural thought, and later continued his studies at Yale University, where he encountered other architects who would go on to achieve international prominence. (Florence, July 23, 1933 – London, December 18, 2021) was a central figure in international architecture from the late twentieth to the early twenty-first century, widely recognized for his role in consolidating high-tech architecture and for his sustained engagement with urban debate. Detail.- The yellow steel structure of the North Core is a slender 200 sqm high tower in its own right housing 22 lifts, 45 lobbies and 82 washrooms along with a diverse range of building services plant. The Leadenhall Building designed by Rogers Stirk Harbour & Partners is the winner of the inaugural City of London Building of the Year award, selected from some 15 buildings that including new construction, extensions and refurbishments.

The practice divides its profits between all of the staff and their chosen charities, according to publicly declared principles. The practice is strongly focused on sustainability, urban regeneration and social awareness, themes that have long been a feature of Rogers’ work. The building construction produced almost zero waste since most of the components were designed and manufactured offsite. The construction of the building was 50% complete in November 2012. Most of the structural and architectural components, including solid concrete floors, were manufactured off-site and then delivered and assembled on-site, which accounts for around 85% of the total construction cost. Another insurance company, Amlin, occupies 111,000ft² of space on levels as well as level 45.